Large Capacity 100 Ton Bridge Erection Gantry Crane for Sale

Products

Large Capacity 100 Ton Bridge Erection Gantry Crane for Sale

Large Capacity 100 Ton Bridge Erection Gantry Crane for Sale

Large Capacity 100 ton Bridge Erection Gantry Crane for sale Bridge girder erection machine merges an adaptation of a wi

Send your inquiry

DESCRIPTION

Basic Info.
Model NO. 100 ton Bridge Erection Gantry Crane
Maximum Lifting Weight >200t
Main Girder Form Double Girder
Type Ordinary
Cart Transverse Moving Speed (M/Min) 2.45
Cart Longitudinal Moving Speed (M/Min) 4.25
Speed of Bridge Transport Vehicle (M/Min 8.5
Return Speed (M/Min) 17
Transportation Capacity (T) 100*2
Applicable Skew Bridge Angle 0-450
Tolley Longitudinal Moving Speed (M/Min) 4.25
Trolley Lifting Speed (M/Min) 0.8
Applicable Span (M) ≤55
Lifting Capacity (T) 200ton
Transport Package Container Loading for Better Cost Saving
Specification 40′HQ or bulk cargo ship
Trademark Nucrane
Origin Henan Changyuan City
Production Capacity 100sets/Month
Product Description
Large Capacity 100 ton Bridge Erection Gantry Crane for sale

Large Capacity 100 Ton Bridge Erection Gantry Crane for Sale


Bridge girder erection machine merges an adaptation of a wide range of work, excellent performance, convenient operation, safety structure into a single whole. It has the steel structure of rail type precast beam hoisting rack equipment. This product can be used not only in plain construction, but also to meet the construction of mountain highway slope, small radius curved bridge, skew bridge and tunnel bridge requirements.

The bridge girder erection machine consists of main girder, crane, front legs, rear legs, front leg cylinder, rear leg cylinder and the transverse connection of front, middle, rear legs. The control part is composed of hydraulic system and electric control system. The bridge girder erection machine is characterized by reasonable compact structure and convenient installation, the main standard girder is connected by pin connection. The double girder structure is connected between the two frame girders by welded pipe.

Large Capacity 100 Ton Bridge Erection Gantry Crane for Sale


The bridge girder erection machine not only can meet the standard set up, but also it can meet the cross curve erection, variable span erection, span continuous beam, composite beam, continuous steel etc. In addition to bridge erection, simply supported girder erection and point lifting, it is characterized by good stability, high efficiency, safety and reliability, variable span convenient adjustment and convenient operation and etc.

Large Capacity 100 Ton Bridge Erection Gantry Crane for Sale


Large Capacity 100 Ton Bridge Erection Gantry Crane for Sale


Technical parameters of girder Launcher crane:
model BGEM50/200BGEM 40/160BGEM 40/160BGEM 35/100BGEM 30/100
Lifting capacity
(t)
200160120100100
applicable span
(m)
≤55≤50≤40≤35≤30
applicable skew bridge angle0-4500-4500-4500-4500-450
trolley lifting speed
(m/min)
0.80.80.81.270.8
tolley longitudinal moving speed
(m/min)
4.254.254.254.254.25
cart longitudinal moving speed
(m/min)
4.254.254.254.254.25
cart transverse moving speed
(m/min)
2.452.452.452.452.45
transportation capacity
(t)
100X280 X260X250X250X2
speed of bridge transport vehicle
(m/min)
8.58.58.58.58.5
return speed
(m/min)
1717171717

Large Capacity 100 Ton Bridge Erection Gantry Crane for Sale


Safety Features
Safety is the most important issue for cranes.To ensure the safety,the following safety devices are equipped in BL crane.Crane traveling limit switch. Overload protection device. Lifting height limit device. Voltage lower protection function . Phase sequence protection function. Emergency stop function. Rain cover for outside hoist, driving units, electric cubicle. Warining indicator : flashing nights and warning sounds. Wire-less infra-detector for anti-collusion.
Packing/Delivery Adevices:
1 Crane Beam & Main Equipment: Packaged by color strip woven plastic cloth for abrasion reduce andmoisture-proof.
2Crane Kit & Electric Accessories: Export standard high quality plywood case for reduce distortion.
3 Loading & Delivery Option: Prefered to choose container loading for better cost saving. Oversize beams and equipment can be cut for container loading as suitable size crane products. Bulk cargo shipment will beused when container loading not available.
4Loading Port: Qingdao Port is prefered, Tianjin Port, Shanghai Port etc. available on your demand.
5Delivery Time: Lead time 30-45days, port time 5 days, estimate time of arraival (ETA) to Xxxxxx Port 35-50 working days.

FAQ1. What's the information should I provide when inquiry about the bridge launching tube beam launcher crane?a.we need the Bridge Drawing, the Maximum longitudinal slope and the Maximum Transverse slope.b.The Girder/beam drawing.2. How many Personnel and equipment to assemble launching gantry in the worksite we need?Personnel: 8 to 10 workers equipmentTruck crane > 50 t : 2 setsΦ19.5 steel wire rope 8 m: 4 ropesSleepers: severalElectric welding machine: 1 setOxygen, acetylene: 1 setHammer(12 pound and 8 pound): 1 set for eachWrench and pincher: several Gradienter: 1 set3. What are inspection standard for load test of bridge launching tube beam launcher crane?Dynamic load test: 1.1 times rated load.Static load test: 1.25 times rated load.4. How to make highway bridge concrete girders?Highway Bridge concrete girders could be made by 4 methods:a. Full span prefabrication.b. Segment girder prefabrication.c. Full span cast-in-place girder.d. Segment cast-in-situ.5. How about maintenance of bridge launching tube beam launcher crane?a. Lubricating:Working performance and service life of all mechanisms of crane depend on lubricating to a big extent.b. Steel wire rope:Fracture of wire has to be specially noticed. A new steel wire rope has to be changed immediately with the condition of broken wire, broken strands and wear loss to scrapping standard.c. Spreader: The spreader has to be checked regularly.d. Pulley block:Mainly check rope race wearing condition, check whether wheel flange is cracked and whether pulley could get stuck in the axle or not.e. Wheels:Regularly check wheel flange and tread, a new wheel has to be immediately replaced as crack part or wearing in wheel flange reaches 10% of wheel thickness;Re-polishing has to be done as diameters between two driving wheels on tread differs more than D/600, or there are severe scar on the tread.f. Brake: Check one time per shift; The brake should be in accurate movement, and pins do not allow to be stuck. Brake shoes shall fit brake wheels correctly; the brake shoes interval shall be equal to open them.